Wasit Bridge across Abu Hadriyah Highway
Construction of an interchange with two ramps and four loops:
Bridge at Wasit intersection, four dual lanes, 1.3 KM long
Link road, four dual lanes, 1.5 KM long
Round-about and two Link roads, four dual Lanes, 7 KM long
Solar Lightning Technology was used for the entire project
Client : Saudi Aramco
Duration : 20 Month
Location : Jubail
/
Related Projects
-
February 28, 2018
Al Qassim & Hail Highway Road
Construction five parts of Qassim/Hail Expressway, the project consists of dual road with three lanes in each direction -
February 28, 2018
Maraba Dam
Construct of earth fill dam and reinforced concrete slap Length: 250 meters Height: 38 meters Storage Capacity: 9