Main Roads in Riyadh
Construction of five intersections with dual road of two to eight lanes and variant lengths including control devices and traffic safety features:
- North Leg of Riyadh Ring Road (Exit 5), a dual road with six lanes
- Abu Baker Road and King Salman Road, a dual road with eight lanes
- Melhem Road with Riyadh-Qassim Expressway, a dual road with four lanes
- Industrial area service road with South Leg of Riyadh Ring Road, two lanes road
- King Abdulaziz Road and King Salman Road, a dual road with eight lanes
Client MOT
Duration : 36 Months
Location :Riyadh
Related Projects
-
February 26, 2018
Wasit Bridge across Abu Hadriyah Highway
Construction of an interchange with two ramps and four loops: Bridge at Wasit intersection, four dual lanes, 1.3 KM -
March 6, 2018
Water & Sewerage Networks
Water, sewerage and storm water drainage projects are considered one of the SAJCO’s major activities. Some of the major -
March 11, 2018
Rock Blasting
SAJCO established rock blasting to support the execution of infrastructure projects. Rock blasting is used to handle