Repair of Taxiway Road in King Khalid int. Airport
A project for asphalt paving of Taxiways at KKIA (Echo Taxiway), which includes the rehabilitation of the ECHO corridor. The entire track was scraped (milled) and re-instated (re-paved), including installation of lighting fixtures on taxiway and intersections.
Client Civil Aviation Authority
Duration : 4 Month
Location : Riyadh