Al Qassim & Hail Highway Road
Construction five parts of Qassim/Hail Expressway, the project consists of dual road with three lanes in each direction and length of 155 Km, including stormwater drainage system by box culverts and concrete pipes, and traffic safety features.
Client MOT
Duration : 48 Month
Location : Qassim – Hail
Related Projects
-
March 11, 2018
Rock Blasting
SAJCO established rock blasting to support the execution of infrastructure projects. Rock blasting is used to handle -
March 6, 2018
Road Construction
SAJCO has been prominent in the execution of roads, bridges, tunnels, interchanges and underpass projects since 1965, -