Al Qassim & Hail Highway Road
Construction five parts of Qassim/Hail Expressway, the project consists of dual road with three lanes in each direction and length of 155 Km, including stormwater drainage system by box culverts and concrete pipes, and traffic safety features.
Client MOT
Duration : 48 Month
Location : Qassim – Hail
Related Projects
-
March 6, 2018
Water & Sewerage Networks
Water, sewerage and storm water drainage projects are considered one of the SAJCO’s major activities. Some of the major -
March 11, 2018
Rock Blasting
SAJCO established rock blasting to support the execution of infrastructure projects. Rock blasting is used to handle -
February 28, 2018
Extension of King Salman Bin Abdulaziz Road
Construction of eight dual lane road with a length of more than 12 KM, service roads, and four bridges, including