Taibah University

Providing and erecting precast cladding panels, GRC screens and hollow core slabs for 6-Taiba University buildings: Conference Hall Building, High Management Building, Deanship Building, classrooms in addition to University fences.

Client  Taibah Uni Taibah University

Duration : 29 Months

Location :Madina


Read More
March 20, 2018

Fire Ranges in Gazlant

Construction of shooting field in Al Madinah.

  • Asphaltic and earthen roads
  • Galvanized steel chain link fence
  • Specialized ranges for shooting purposes
  • Helipads using the latest standards

Client: Saudi Arabian National Guard

Duration: 18 Month

Location: Riyadh


Read More
March 20, 2018

Main Roads in Riyadh

Construction of five intersections with dual road of two to eight lanes and variant lengths including control devices and traffic safety features:

  • North Leg of Riyadh Ring Road (Exit 5), a dual road with six lanes
  • Abu Baker Road and King Salman Road, a dual road with eight lanes
  • Melhem Road with Riyadh-Qassim Expressway, a dual road with four lanes
  • Industrial area service road with South Leg of Riyadh Ring Road, two lanes road
  • King Abdulaziz Road and King Salman Road, a dual road with eight lanes

Client  MOT

Duration : 36 Months

Location :Riyadh


Read More

Execution of a carrier line by FGCP – Fiber Glass Concrete Pre-Coated pipes, measuring 60 KM long and diameter of 1000 MM.

Client  MEWA

Duration : 45 Months

Location :Aseer


Read More
February 28, 2018

Maraba Dam

Construct of earth fill dam and reinforced concrete slap

Length: 250 meters
Height: 38 meters
Storage Capacity: 9 million m3

Client  MEWA

Duration : 45 Month

Location : Aseer


Read More
February 28, 2018

University of Hail

Constructing 10 buildings for Hail university management and colleges with a total area 22000 square meters in addition to the university fence that reached 12 KM using complete precast frame system which contains Columns, beams, hollow core and double tee slabs and Cladding panels and Load bearing panels.

Client  University Of Hail

Duration : 24 Month

Location : Hail


Read More

Construction of eight dual lane road with a length of more than 12 KM, service roads, and four bridges, including traffic and safety features.

Client   MOT

Duration : 20 Month

Location : Riyadah


Read More

A project for asphalt paving of Taxiways at KKIA (Echo Taxiway), which includes the rehabilitation of the ECHO corridor. The entire track was scraped (milled) and re-instated (re-paved), including installation of lighting fixtures on taxiway and intersections.

Client  Civil Aviation Authority

Duration : 4 Month

Location : Riyadh


Read More

Construction of two underpasses and two U-turn bridges at Imam Saud Bin Abdulaziz Road at its intersection with Riyadh Eastern Ring Road. The project includes a dual road with three lanes in each direction measuring 3 KM long, a stormwater drainage system, and traffic safety features.

Client   Riyadh Municipality

Location : Riyadh


Read More
February 28, 2018

Al Qassim & Hail Highway Road

Construction five parts of Qassim/Hail Expressway, the project consists of dual road with three lanes in each direction and length of 155 Km, including stormwater drainage system by box culverts and concrete pipes, and traffic safety features.

Client   MOT

Duration : 48 Month

Location : Qassim – Hail


Read More