Construction of a Bridge at Anas Ibn Malik Road
Construction of a bridge at Anas ibn Malik Road over King Abdulaziz Road, measuring 475 meters long and a width of 6 lanes.
Client Riyadh Municipality
Duration : 18 Month
Location : Riyadh
Read More
Al-Ahsobah Dam
Construction of earth fill dam and reinforced concrete slaps:
Height: 22 meters
Length: 825 meters
Storage Capacity: 12 million m³
Client SANG
Duration : 18 Month
Location : Riyadh
Read More
Prince Turki Bin Abdulaziz Al-Awwal Road
Execution of Prince Turki Bin Abdulaziz Al Awwal Road project by underpasses at its intersection with Musa Bin Nusair Road, Prince Mohammed Bin Abdulaziz Road, and Al Orubah Road. The project extends southwards to the intersection of Makkah Road, where the main freeway road is comprised of three lanes with shoulders and a median-island. The service road consists of two lanes as well as the third additional lane for longitudinal parking, inclusive of sidewalks on both sides of the road.
Client Riyadh Municipality
Duration: 24 Month
Location: Riyadh
Read More
North-West Leg Riyadh Ring Road
Construction of a highway to connect the northern and western Riyadh city ring road.
The latest technologies and equipment were used during the execution of the project. The quantities of the most important elements were as follow
- Four lanes in each direction
- Service roads
- Three Wadi bridges
- Seven interchanges
- Overpasses
- Storm-water drainage system
- Lighting
- Traffic safety features
Client MOT
Duration: 36 Month
Location: Riyadh
Read More
Wasit Bridge across Abu Hadriyah Highway
Construction of an interchange with two ramps and four loops:
Bridge at Wasit intersection, four dual lanes, 1.3 KM long
Link road, four dual lanes, 1.5 KM long
Round-about and two Link roads, four dual Lanes, 7 KM long
Solar Lightning Technology was used for the entire project
Client : Saudi Aramco
Duration : 20 Month
Location : Jubail
Read More