+966 11 4787005
February 26, 2018
/

Wasit Bridge across Abu Hadriyah Highway

Construction of an interchange with two ramps and four loops:

Bridge at Wasit intersection, four dual lanes, 1.3 KM long
Link road, four dual lanes, 1.5 KM long
Round-about and two Link roads, four dual Lanes, 7 KM long
Solar Lightning Technology was used for the entire project

Client :  Saudi Aramco

Duration : 20 Month

Location : Jubail