Wasit Bridge across Abu Hadriyah Highway
Construction of an interchange with two ramps and four loops:
Bridge at Wasit intersection, four dual lanes, 1.3 KM long
Link road, four dual lanes, 1.5 KM long
Round-about and two Link roads, four dual Lanes, 7 KM long
Solar Lightning Technology was used for the entire project
Client : Saudi Aramco
Duration : 20 Month
Location : Jubail
/