Water Carrier Line from East Tathleeth to Treatment Plant
Execution of a carrier line by FGCP – Fiber Glass Concrete Pre-Coated pipes, measuring 60 KM long and diameter of 1000 MM.
Client MEWA
Duration : 45 Months
Location :Aseer
Related Projects
-
February 26, 2018
Construction of a Bridge at Anas Ibn Malik Road
Construction of a bridge at Anas ibn Malik Road over King Abdulaziz Road, measuring 475 meters long and a width of 6 -
February 28, 2018
Maraba Dam
Construct of earth fill dam and reinforced concrete slap Length: 250 meters Height: 38 meters Storage Capacity: 9 -
March 6, 2018
Production of Road Construction Materials
Coming from the company’s assurance to guarantee high quality products used in different projects [gallery