![](https://sajco.com/wp-content/uploads/2024/10/DSC06850-700x477.jpg)
Construction of two underpasses and two U-turn bridges at Imam Saud Bin Abdulaziz Road at its intersection with Riyadh Eastern Ring Road. The project includes a dual road with three lanes in each direction measuring 3 KM long, a stormwater drainage system, and traffic safety features.
Client
Riyadh Municipal
Duration
18 Months
Location
Riyadh