Construction of two underpasses and two U-turn bridges at Imam Saud Bin Abdulaziz Road at its intersection with Riyadh Eastern Ring Road. The project includes a dual road with three lanes in each direction measuring 3 KM long, a stormwater drainage system, and traffic safety features.

Client

Riyadh Municipal

Duration

18 Months

Location

Riyadh