Construction of five intersections with dual road of two to eight lanes and variant lengths including control devices and traffic safety features:

  • North Leg of Riyadh Ring Road (Exit 5), a dual road with six lanes
  • Abu Baker Road and King Salman Road, a dual road with eight lanes
  • Melhem Road with Riyadh-Qassim Expressway, a dual road with four lanes
  • Industrial area service road with South Leg of Riyadh Ring Road, two lanes road
  • King Abdulaziz Road and King Salman Road, a dual road with eight lanes
Client

Ministry of Transport & Logistic Services

Duration

36 Months

Location

Riyadh