The construction project for the Qassim/Hail Expressway encompasses five key segments, each designed as a dual carriageway featuring three lanes in both directions, covering a total length of 155 kilometers. Additionally, the project incorporates an advanced stormwater drainage system facilitated by a network of box culverts and concrete pipes, ensuring effective water management along the route. Furthermore, the expressway is equipped with comprehensive traffic safety measures, enhancing the overall safety and usability of the roadway for motorists.

Client

Ministry of Transport & Logistic Services

Duration

36 Months

Location

Qassim & Hail