Imam Saud Road with Eastern Riyadh Ring Road Exit 9
Construction of two underpasses and two U-turn bridges at Imam Saud Bin Abdulaziz Road at its intersection with Riyadh Eastern Ring Road. The project includes a dual road with three lanes in each direction measuring 3 KM long, a stormwater drainage system, and traffic safety features.
Client Riyadh Municipality
Location : Riyadh
Related Projects
-
March 20, 2018
Main Roads in Riyadh
Construction of five intersections with dual road of two to eight lanes and variant lengths including control devices -
March 11, 2018
Rock Blasting
SAJCO established rock blasting to support the execution of infrastructure projects. Rock blasting is used to handle -
March 6, 2018
Production of Road Construction Materials
Coming from the company’s assurance to guarantee high quality products used in different projects [gallery